Our projects
Completed projects
53 Projects
Infrastructure
24 Projects
Offshore & Marine
17 Projects
Structures
12 Projects
Our portfolio – projects we have completed so far:
Infrastructure
24
Offshore & Marine
17
Structures
12
Amagervaerket – Enterprise 5
Concrete – 2800m3
Reinforcing steel – 360t
Renseanlaeg Lynetten, Copenhagen
reinforement assembly
carpentry
Walls prefabrication – Arm-Tec
reinforcement assembly
concrete casting
forklift
Strandgården – block works
block works
concrete works
Frederikshavn Naval Base
Total length of bulwark reconstruction: 1570m
Total length of bulwark execution: 700 m
BIO4 – Amager Power Plant
Number of prefabricated filigree elements: 700
BIO5 – Amager Power Plant
Material:
Concrete – 2800 m3
Reinforcing steel – 360
Nissum Bredning Offshore Wind Farm
The production of four foundations for wind turbines
Lynetten sewage treatment plant, Copenhagen
No. of tanks: 2
Capacity of each tank:
6,000 m3
Rødsand 2 offshore wind farm
10,000 tons of reinforcing steel
No. of foundations: 90
City hall and health centre, Egedal
Total cubage:
94,242 m3
Total floorage: 19,348 m2
Køge Bugt motorway, stage 2
3 road bridges over the motorway
1 road bridge over the railway tracks
5 culverts and pedestrian & animal crossings
1 railway tunnel
LNG Terminal in Świnoujście
4,000 tons of steel
4,500 Lenton joints
Construction of the breakwater in Świnoujście
7,500 tons of prefabricated reinforcing steel
740 joints between piles and anchors with the diameter of 1,220 mm
Helsingør motorway
3 road bridges above the motorway
London Array wind farm
177 concrete platforms
620 tons of steel
Road tunnel, Køge Nord
Total length: 400 m
Length of the tunnel: 150 m
A bridge in Svenstrup
Length of the bridge: 110 m + 80 m of the ramp
Width of the bridge: 12.4 m
Consumed concrete: 1,950 m3
Navigation beacons
Weight of the precast beacons:
550 tons + 300 tons
Greenland – Thule Air Base
reinforcement assembly
carpentry
concrete casting
Horns Rev 1 offshore wind farm
No. of foundations: 80
Port – Frederikshavn
Manufacturing of prefabricated walls and anchor plates
Borkum Riffgrund 2 Offshore Wind Farm
36 foundations for the offshore wind farm
Bridge – Aalborg Ring Syd
T- beam construction
Sallingsund Bridge
Elements to produce: 4
Dimensions of element: 15 x 15 x 6 m
Weight: 450-600 t
Hornsea Offshore Wind Farm
21 concrete platforms for foundations of a wind farm
Port – Esbjerg Strand
number of prefabricated elements: 816
total weight of prefabricated elements: 5150 t
Bridge – Masnedsund
Number of spans: 6
Length of spans: 33 m
Concrete: 4400 m3
Visby cruise ship quay
22 foundations
20 decks
2 mooring dolphins
Næstved Bypass – Suså river bridge
500 m expansion of the Næstved Bypass
Skærbæk Power Plant – DONG
Pellet depot’s size: ca. 120 x 22 m
1500 m3 of concrete
Underpass – Køge
Larger platform ca. ok. 270 m²
Smaller platform ca. 120 m²
Breakwater – Køge Jorddepot
length of the breakwater: ca. 800 m
number of blocks: ca. 1,000
Footbridge – Køge Kyst
reinforced concrete – ca. 360 m²
prefabricated beams - ca. 2000 m²
Lillgrund offshore wind power plant
No. of foundations: 48
Sprogø offshore wind farm
No. of foundations: 7
945 tons of reinforcing steel
X-block project
X-block No.:
over 28,000
Tetrapod blocks
Reinforcing steel: 392.6 ton
Concrete: 3,640 m3
Project Ålesund
Reinforcing elements: 501 tons
Maersk building in Panum complex, Copenhagen
No. of floors: 16
Floor space: 42,700 m2
Frederikssundmotorvejen expressway junctions
No. of bridges: 5
Length: 3.8 km
Køge Bugt motorway, stage 1
Structures: several bridges
Length: 4.8 km
Karlstrup Mose bridges
No. of bridges: 4
Length: 145 m
Värtahamnen harbour, Stockholm
Construction site area:
85,000 m2
Embankment:
1,200 m2
Frederikssundmotorvejen expressway
Length: 4.4 KM
Number of bridges: 7
Construction of the footbridge between Nordhavn and Østerbro, Copenhagen
Length: 100 m
Construction of bridges near Arken Museum, Ishøj
No. of bridges: 4
Boardwalk in Marmormolen, Copenhagen
Floor space: 1,070 m2
Terslev Skolevej bridge, Haslev
Footbridge for pedestrians and cyclists, Copenhagen
Length of the footbridge: 140 m
Width of the footbridge: 7 m
Construction of bridges along TP 40 railroad
Major bridges:
211 m, 516 tons of steel
115 m, 328 tons of steel
Nysted offshore wind farm
No. of foundations: 72
Structures along TP 41 railroad
Length: 4.8 km
No. of bridges: 12
This site uses cookies. By continuing to browse the site, you are agreeing to use of cookies according to our